SOIL CONSERVATION

 

 

Activities of Soil Conservation Department in Nayagarh District

 watershed Management. 

      Land & water are too most valuable gift of nature to mankind which are vital for sustenance of fauna & flora on this planet earth rainfed area from a large part of arable land in the country. They are also liable to environment damage on account of Soil erosion due to un-reliability of rainfall from year to year.

      The current approach & strategy for rainfed farming are based on the concept of Conservation of rain water for holistic & integrated development of potential watersheds including the problem area such as hilly, Saline, water logged, Costal & desert eco systems & promotion.        

        On order to mitigate the ill effects of drought & flood watershed management programme has provided to be a successful measure. Watershed development is somewhat a recent terminology applied to the spare of developmental activities focusing not only on Agriculture but also othe developmental programme like forestry, Animal husbandry, Pasture development Pisciculture, & farm development etc. on area saturation basis. Therefore such development activities have now been advocated to be done on watershed basis. Management of watershed is the basic approach for successful crop production with insitu moisture Conservation.

N.W.D.P.R.A. scheme. 

           The N.W.D.P.R.A. scheme was lunched by Government of India during 8th plan period with the following objectives. 

1.            Conservation, development & sustainable management of natureresources including their use.

2.            enhancement of Agriculture productivity & production in a sustainablemanner.

3.            Restoration of Ecological balance in the degraded & fragile rainfed eco-systems by greening these  areas through appropriate mix of trees, shurbs& grasses.

4.            Reduction in regional disparity between irrigated & rainfed area.Creation of sustained employment  opportunities for the rural community including the landless.             

         Thus the ultimate aim of the programme is to develop nature resources, based on         sustainable   productivity, improve standard of living of poor farmers, landless labours & to restore the ecological    balance. 

As pr the guidelines of the scheme a block having less than 30 % of assured irrigation in the arable land hill qualify for inclusion under this programme. 

The Orissa remote sensing application center (ORSAC) have delineated & codified district wise watershed up to Micro watershed level. Total watershed identified, Saturated & under execution in the district of Nayagarh are given below.

Sl.No

Name of the District

Name of the block

No. of watershed identified

No. of Villages

Geographically area

 (in Ha.)

No. of on going watershed

Total No. of saturated

N.W.D.P.R.A.

I.W.D.P.

Hariyalli

N.W.D.P.R.A.

I.W.D.P.

E.A.S.

1

2

3

4

5

6

7

8

9

10

11

12

1.

Nayagarh

Bhapur

44

350

23960.16

1

-

-

1

-

-

 

Nayagarh

Daspalla

165

1246

89014.46

1

-

10

1

-

1

 

Nayagarh

Gania

74

364

49879.49

1

-

-

1

-

-

 

Nayagarh

Khandapara

68

562

34911.03

1

-

-

1

-

-

 

Nayagarh

Nayagarh

63

523

23548.01

1

-

5

1

-

-

 

Nayagarh

Nuagaon

121

831

65104.78

1

10

-

1

-

-

 

Nayagarh

Odagaon

91

725

49328.68

1

-

5

1

-

-

 

Nayagarh

Ranpur

108

704

61256.42

-

-

-

1

-

1

 

Total

734

5305

397003.03

7

10

20

8

-

2

 Basic information of Nayagarh District. 

            Nayagarh district came to its existence vide Government notification (Rev. Dept.) No. 14218 dt. 27.03.1993. The district Nayagarh lies between   20o-5’ to 20o-10’ north latitude and 85o-5’ to 85o-10’ East longitude. Its border touches the districts of Angul & Cuttack in North West, Phulubani in West, Ganjam in the South and Khurda in the East. The district covers an area of 4242 sqkm. (394110 Ha.) and the major portion of the district is covered with hilly terrains, high land dense forest.   

1         Total Geographical area                                        :            394110 Ha. (4242 sqkm.)

2         Cultivated area                                                     :            136814 Ha.

3.       High land                                                             :            53194 Ha.

4.       Medium land                                                          :            46866 Ha.

5.       Forest area                                                            :            38086 Ha. 

6.       Permanent pasture                                                 :            9958 Ha.

7.       Cultivable wasteland                                                 :            8570 Ha.

8.       Barren & uncultivable waste                                    :            11577 Ha.

9.               Land put to non Agricultural use                               :            26230 Ha.

10       temperature                                  Maximum            :           44o C

                                                               Minimum            :           11o C

topography                                                                  :            Undulated

 River system of the district. 

            The following are the rivers flowing in the district.

1.                  Kusumi,

2.                  Brutang,

3.                  Mahanadi 

Scheme under operation through Soil  Conservation Department. 

            At present 3 (Three) centrally sponsored scheme namely N.W.D.P.R.A. (National Watershed Development Project for Rainfed Areas), I.W.D.P. (Integrated Watershed Development Programme) & Hariyalli are under operation in the district.                         

Funding Pattern. 

            The scheme is under implementation with the funding pattern of 75 % grant by the Government of India and 25 % loan to state Government. As per guidelines issued by the Government of India the per hectare cost norm is      Rs. 4, 500/-. The Government of India releases funds in favour of state Government (Agriculture Department). The Agriculture Department in turn provide funds to the Director, Soil Conservation, Orissa, Bhubaneswar for implementation of the scheme. In the district, Soil Conservation Officer has been acting as the nodal Officer and Asst. Soil Conservation officers are acting as PIA. as per guidelines of the scheme out 100 % allocation, 10 % is meant for administrative Charges, (7.5 %) Community Organization, (5 %) Training totaling 22.5 %. The rest 77.5 % is meant for development work which includes 50 % for natural Resource Management, 20 % for Agricultural Development and 7.5 % for non Agricultural based development programme. At the watershed level watershed Committee have been formed who are actually executing different field work with the technical assistance rendered by Watershed Development Team Members from various department.

N.W.D.P.R.A. Scheme in Nayagarh District. 

             7 Nos. of micro watershed are in each Block except Odagaon have been under execution with an area of 3464.966 Ha. for takingup comprehensive watershed treatment under N.W.D.P.R.A. scheme during Xth plan period with effect from 2002-2003. The watershed treatment is being taken up through the watershed committee (Bhumi panchayat). Funds for the works are being placed in phased manner with the watershed committee. The implementation on various treatment measure have been takenup as per the guidance of watershed Development Team under P.I.A. – Cum – Asst. Soil Conservation Officer, Nayagarh. The following watershed are in operation under the programme. 

Sl.no

Name of the block

Name of the micro watershed

Area in Ha.

1

2

3

4

1

Nayagarh

Khuntubandha

478.38

2

Nuagaon

Sulianalla

528.71

3

Ranpur

Bankanalla

460.526

4

Daspalla

Kuanrianalla

524.952

5

Gania

Dasipurnalla

546.08

6

Khandapara

Morrahanalla

490.918

7

Bhapur

Kuinnalla

435.40

 

Total

3464.966

  Watershed under execution during Xth plan period.

Sl.no

Name of the district

Name of the block

Name of the watershed

Name of the G.P.

Name of the village coming in the watershed

1

2

3

4

5

6

1

Nayagarh

Ranpur

Bankanalla

0407010201160101(02)

Kasanda

Kasanda

Kotanisila

Kasanda 

2

Nayagarh

Nayagarh

Khuntubandha

0407010303100102(03)

Jemadeipur

Jemadeipurpatna

Jemadeipurpatna

Jemadeipurpatna

khuntubandha

khuntubandha

Mandhatapur

Jemadeipurpatna

Raghunathprasad

Lausena

Godiali

khuntubandha

3

Nayagarh

Daspalla

Kuanrianalla

0407010302270202

Sariganda

Sariganda

Pokhrigochha

Pokharigochha

Tumandi

Tumandi

Dalipadar

Badakameti

Tangisahi

Pipalpadar

Kandhabudhapadar

Oriyabudhapadar

4

Nayagarh

Bhapur

Kuinnalla

0407010301190201

Bausabati

Patharchakada

Patharchakada

Marada

Kendupalli

Podasahi

5

Nayagarh

Khandapara

Morrahnalla

0407010302080202

Kiajhar

Kiajhar

Kiajhar

Kiajhar

Gochhabari

Sanakhajuria

Badakhajuria

Petapalli

6

Nayagarh

Nuagaon

Sulianalla

040701032130201(02)

Durdura

Durdura

Durdura

Durdura

Banamalipur

Nuapalli

Nelibari

Gopinathpur

7

Nayagarh

Gania

Dasipurnalla

0407010304260201

Dasipur

Routpada

Maliput

Dasipur

Routpada

Maliput

 N.W.D.P.R.A. 

(A)       Total area treated for moisture Conservation over 345.35Ha. from which 45 Ha. can be put under high yielding paddy & 25 Ha. can be diverted from paddy non-paddy crops like vegetables, Oilseed & pulses.

(B)       Total irrigation (live saving) potential created over 104 Ha. where cashew crop like vegetables, Oilseeds pulses can be taken up over 24 Ha.  

Plantation programme. 

            The plantation programme have been taken up in 3 Nos. micro watershed of N.W.D.P.R.A. scheme & 2Ha. of fodder cultivation have been taken up in 2 Nos. of watersheds.  

W.H.S. (Water Harvesting Structure). 

             The objectives of construction of water harvesting structure.

(i)         collect runoff for subsequent utilization in Agriculture crops for life saving irrigation.

(ii)        To recharge sub-surface as well as ground water.

(iii)       To save the valuable Agriculture lands from degradation as well as sand casting.

(iv)       To develop Micro-Climate to heep the flora & founa etc.

            So far 85 Nos. of W.H.S. / D.W.S. in different blocks of Nayagarh district executed by Soil  Conservation Department are existing in the functioning stage. These  W.H.S. / D.W.S. contribute supplementary irrigation in the order of 1315.92 Ha. in Kharif & 226.6 Ha. in Rabi.

Achievement made under N.W.D.P.R.A. Xth plan period (Nayagarh District). 

Sl.No

Item of work

Khuntubandha

2002-2003

2003-2004

2004-2005

2005-2006

Phy.

Fin.

Phy.

Fin.

Phy.

Fin.

Phy.

Fin.

1

2

3

4

5

6

7

8

9

10

1

Earthen structure

-

-

-

-

-

-

-

-

2

Runoff management structure

-

-

-

-

-

-

-

-

3

Renovation of tank

1 No.

1.42

1 No.

0.58

-

-

-

-

4

Farm pond

-

-

-

-

-

-

-

-

5

Sunken pond

-

-

-

-

-

-

-

-

6

Earthen check dam

-

-

-

-

31.5 rmt.

0.10

-

-

7

Water Harvesting structure

-

-

-

-

-

-

-

-

8

Diversion weir

-

-

1 No.

0.7465

-

-

-

-

9

Percolation tank

-

-

-

-

-

-

-

-

10

Gully control structure

-

-

-

-

-

-

-

-

11

Improvement of existing structure

1 No.

0.75

1 No.

0.817

-

-

-

-

12

Drop spillway

-

-

2 No.

0.537

1 No.

0.30

-

-

13

Guide earthen bond

-

-

417.25

0.35

-

-

-

-

14

Construction of community hall

-

-

-

-

-

-

-

-

15

Bank stabilization

-

-

-

0.15

-

-

-

-

16

Guard wall (masonry)

-

-

50 rmt

0.268

-

0.54

-

-

17

Livelihood support to landless families

-

-

-

-

-

0.20

-

-

18

Dryland Horticulture (Mango, Coconut)

-

-

-

-

800 No.

0.1266

-

-

19

Agriculture input

-

-

-

-

3 No.

0.184

-

-

20

Homestead kitchen graded

-

-

-

-

200 No.

0.06

-

-

21

Distribution of mini mix. Medicine

-

-

-

-

-

0.045

-

-

22

Crop demonstration

-

-

-

-

-

-

-

-

23

Plantation (Teak, Misc.)

-

-

-

-

0.01

0.125

-

-

24

Household production system to landless families (Goat rearing)

-

-

-

-

-

0.3194

-

-

25

Assistance to Pisciculture

-

-

-

-

-

-

-

-

26

Livestock management

-

-

-

-

-

-

-

-

27

Agro forestry

-

-

-

-

-

-

-

-

28

Loose boulder check dam

-

-

-

-

-

-

-

-

29

L.B.C. with vegetative support

-

-

-

-

-

-

-

-

30

Planting of vegetation in LBCD

-

-

-

-

-

-

-

-

31

Field bound

-

-

-

-

-

-

-

-

 

Total

 

2.17

 

3.4485

 

2.00

 

 

  

(Table contd……….)

 

Sl.No

Item of work

Sulianalla

2002-2003

2003-2004

2004-2005

2005-2006

Phy.

Fin.

Phy.

Fin.

Phy.

Fin.

Phy.

Fin.

1

2

3

4

5

6

7

8

9

10

1

Earthen structure

-

-

-

-

-

-

-

-

2

Runoff management structure

-

-

-

-

-

-

-

-

3

Renovation of tank

-

-

1 No.

1.025

1 No.

0.67412

-

-

4

Farm pond

-

-

-

-

-

-

-

-

5

Sunken pond

-

-

-

-

-

-

-

-

6

Earthen check dam

-

-

-

-

-

-

-

-

7

Water Harvesting structure

-

-

1 No.

1.08

1 No.

0.968

-

-

8

Diversion weir

-

-

1 No.

1.3535

1 No.

1.0715

-

-

9

Percolation tank

2 No.

1.92

-

-

-

-

-

-

10

Gully control structure

-

-

-

-

-

-

-

-

11

Improvement of existing structure

-

-

-

-

-

-

-

-

12

Drop spillway

-

-

-

-

-

-

-

-

13

Guide earthen bond

-

-

-

-

-

-

-

-

14

Construction of community hall

-

0.27723

-

-

-

-

-

-

15

Bank stabilization

-

-

-

-

-

-

-

-

16

Guard wall (masonry)

-

-

-

-

-

-

-

-

17

Livelihood support to landless families

-

-

-

-

-

-

-

-

18

Dryland Horticulture (Mango, Coconut)

-

-

-

-

-

-

-

-

19

Agriculture input

-

-

60 No.

0.045

-

-

-

-

20

Homestead kitchen graded

-

-

12 No.

0.045

-

-

-

-

21

Distribution of mini mix. Medicine

-

-

-

-

-

-

-

-

22

Crop demonstration

-

-

-

-

10 No.

0.10

-

-

23

Plantation (Teak, Misc.)

-

-

-

-

-

-

-

-

24

Household production system to landless families (Goat rearing)

-

-

-

-

-

-

-

-

25

Assistance to Pisciculture

-

-

-

-

-

-

-

-

26

Livestock management

-

-

-

-

-

-

-

-

27

Agro forestry

-

-

-

-

-

-

-

-

28

Loose boulder check dam

-

-

-

-

-

-

-

-

29

L.B.C. with vegetative support

-

-

-

-

-

-

-

-

30

Planting of vegetation in LBCD

-

-

-

-

-

-

-

-

31

Field bound

-

-

-

-

-

-

-

-

 

Total

 

2.19723

 

3.7458

 

3.00

 

 

  

(Table contd……….)

Sl.No

Item of work

Bankanalla

2002-2003

2003-2004

2004-2005

2005-2006

Phy.

Fin.

Phy.

Fin.

Phy.

Fin.

Phy.

Fin.

1

2

3

4

5

6

7

8

9

10

1

Earthen structure

-

-

-

-

-

-

-

-

2

Runoff management structure

-

-

-

-

-

-

-

-

3

Renovation of tank

-

-

-

-

-

-

-

-

4

Farm pond

-

-

-

-

-

-

-

-

5

Sunken pond

-

-

-

-

-

-

-

-

6

Earthen check dam

-

-

-

-

-

-

-

-

7

Water Harvesting structure

2 No.

1.80

1 No.

1.75

2 No.

1.90

-

-

8

Diversion weir

-

-

-

-

-

-

-

-

9

Percolation tank

-

-

-

-

-

-

-

-

10

Gully control structure

1 No.

0.06723

-

-

-

-

-

-

11

Improvement of existing structure

-

-

-

-

-

-

-

-

12

Drop spillway

-

-

-

-

-

-

-

-

13

Guide earthen bond

-

-

-

-

-

-

-

-

14

Construction of community hall

-

-

-

-

-

-

-

-

15

Bank stabilization

-

-

-

-

-

-

-

-

16

Guard wall (masonry)

-

-

-

-

-

-

-

-

17

Livelihood support to landless families

-

-

-

-

-

-

-

-

18

Dryland Horticulture (Mango, Coconut)

-

-

130 No.

0.13

-

-

-

-

19

Agriculture input

-

-

-

-

-

-

-

-

20

Homestead kitchen graded

-

-

-

-

-

-

-

-

21

Distribution of mini mix. Medicine

-

-

-

-

-

-

-

-

22

Crop demonstration

-

-

-

-

-

-

-

-

23

Plantation (Teak, Misc.)

-

-

-

-

-

-

-

-

24

Household production system to landless families (Goat rearing)

-

-

-

-

-

-

-

-

25

Assistance to Pisciculture

-

-

-

-

-

-

-

-

26

Livestock management

-

-

-

-

-

-

-

-

27

Agro forestry

-

-

1400

0.35

-

-

-

-

28

Loose boulder check dam

10 No.

0.53

-

0.4185

-

-

-

-

29

L.B.C. with vegetative support

-

-

-

-

-

-

-

-

30

Planting of vegetation in LBCD

-

-

-

-

-

-

-

-

31

Field bound

-

-

-

-

-

-

-

-

 

Total

 

2.39723

 

3.2485

 

1.90

 

 

 

Hariyalli scheme.  

            As per Government of India stipulation area development programme shall be implemented in accordance with the guidance with the guidelines for Hariyalli scheme with effect from 01.04.03. 

Funding pattern. 

            As per guidelines of the scheme per Ha. cost norm is Rs. 6000/- out of which Rs. 5500/- is G.O.I. share and Rs. 500/- is the state share. Out of 100 % allocation, 10 % is meant for administrative cost and 5 % is meant for training and community organization. Rest 85 % is for developmental programmes and are executed by the watershed committee. 

Allotment & expenditure. 

            This scheme is under operation from the year 2005-2006. all total 20 watersheds are under execution covering the blocks of Nayagarh, Odagaon and Daspalla. The Asst. Soil Conservation Officer, Nayagarh is acting as P.I.A. for Nayagarh and Odagaon block and one Jr.S.C.O is P.I.A. Daspalla block. The watershed wise allotment and expenditure is given below. 

The watershed wise allotment and expenditure. 

Sl.No

Name of the block

Name of the watershed with code No.

Allotment during 2005-2006

Expenditure during 2005-2006

(upto December2005)

1

2

3

4

5

1

Nayagarh

Tulasipur

0407010302120102(02)

0.603

0.302

2

Nayagarh

Chandibasta

0407010302120203(01)

0.864

0.432

3

Nayagarh

Bhatasahi

0407010302120202(02)

1.026

0.518

4

Nayagarh

Muktapur

0407010302120101(02)

0.936

0.466

5

Nayagarh

Sulia – Dianpada

0407010302120201(02)

0.621

0.308

6

Nayagarh

Sabideipur-Darapada

0407010303110202(01)

0.936

0.467

7

Nayagarh

Fasipalli

0407010303150102(02)

0.9558

0.478

8

Nayagarh

Baunsagadia

0407010303150101(03)

1.1142

0.567

9

Nayagarh

Kusapanderi

040701030310102(03)

1.08

0.54

10

Nayagarh

Raghunathpur-Barapalla

0407010303160201(02)

0.864

0.432

 

 

 

9.00

4.51

 

Annexure - B

Basic Information

Name of the P.I.A. : Asst. Soil Conservation Officer,          Name of the Block :Nayagarh / Odagaon Name of Scheme: IWDP – IV (Hariyalli)      

                                                   Nayagarh.                                                                                                         

                                                                                                                                                       Rs. In Lakhs / Area in Ha.

Sl.no

Name & code No. of Micro Watershed

Date of sanction

Project period

Total geographical area in Ha.

Total treatable area in Ha.

No. of village covered

Population in Nos.

Total project outlay

From

To

Arable land

Non– arable land

Total

SC

St

OC

Total

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

 

Nayagarh Block

 

 

 

 

 

 

 

 

 

 

 

 

 

1.

Sulia – Dianpada

0407010302120201 (02)

1518 27.05.05 of D.W.M (O) BBSR

05-06

09-10

456.39

144.38

200.62

345.00

2

-

-

473

473

20.70

2.

Muktapur

0407010302120101 (02)

 

05-06

09-10

551.01

459.10

60.90

520.00

6

833

113

1716

2662

31.20

3.

Chandibasta

0407010302120203 (01)

 

05-06

09-10

480.56

414.18

65.82

480.00

5

947

60

1926

2933

28.80

4.

Bhatasahi

0407010302120202 (02)

 

05-06

09-10

581.07

398.15

171.85

570.00

4

331

16

1799

2146

34.20

5.

Tulasipur

0407010302120102 (02)

 

05-06

09-10

335.37

149.30

185.70

335.00

5

238

-

1733

1971

20.10

 

Odagaon Block

 

 

 

 

 

 

 

 

 

 

 

 

 

6.

Raghunathpur – Barapalla

0407010303160201 (02)

 

05-06

09-10

524.82

363.46

116.54

480.00

2

249

180

1012

1441

28.80

7.

Kusapanderi

0407010303160202 (03)

 

05-06

09-10

708.00

480.23

119.77

600.00

4

57

135

322

514

36.00

8.

Fasipalli

0407010303150102 (02)

 

05-06

09-10

631.00

338.98

192.02

531.00

4

199

68

1096

1363

31.86

9.

Sabideipur – Darapada

0407010303110202 (01)

 

05-06

09-10

652.00

264.07

255.93

520.00

4

180

-

1164

1344

31.20

10.

Baunsagadia

0407010303150101 (03)

 

05-06

09-10

720.00

585.44

33.56

619.00

5

591

-

3102

3693

37.14

 

Total 10 Nos. of M.W.S.

-

-

-

5640.22

3597.29

1402.71

5000.00

41

3625

572

14343

18540

300.00

  

Annexure – G

Works in Details

Sl

no

Name of the micro – watershed / code no.

Block

G.P

Location

Type of work

Amount spent

 (in Lakh.)

Remarks

1

2

3

4

5

6

7

8

1

Raghunathpur – Barapalla

0407010303160201 (02)

Odagaon block

Machhipada

Barapalla

Construction of w.h.s.

1.92

On going stage

2

Kusapanderi

0407010303160202 (03)

Odagaon block

Gotisahi

Jiripada

Construction of farm pond

2.40

On going stage

3

Fasipalli

0407010303150102 (02)

Odagaon block

Magarabandha

Bitalagadia

Construction of w.h.s.

2.12

On going stage

4

Sabideipur – Darapada

0407010303110202 (01)

Odagaon block

Magarabandha

Sabideipur

Improvement and renovation of w.h.s.

2.08

On going stage

5

Baunsagadia

0407010303150101 (03)

Odagaon block

Saradhapur

Vadikila

Construction of p.t.

2.48

On going stage

6

Sulia – Dianpada

0407010302120201 (02)

Nayagarh block

Bhatasahi

Sulia

Diversion earthen bond with construction of canal

1.38

On going stage

7

Muktapur

0407010302120101 (02)

Nayagarh block

Bhatasahi

Karadabani

Construction of p.t.

2.08

On going stage

8

Chandibasta

0407010302120203 (01)

Nayagarh block

Bhatasahi

Baradwara

Construction of w.h.s.

1.92

On going stage

9

Bhatasahi

0407010302120202 (02)

Nayagarh block

Bhatasahi

Ladukishorapur

Construction of w.h.s.

2.28

On going stage

10

Tulasipur

0407010302120102 (02)

Nayagarh block

Bhatasahi

Ballavpur

Construction of w.h.s.

1.34

On going stage

 

Total

20.00

 

 